DuPont Cladding Tunnel East
Portal
A massive steel and concrete enforced blast door was left open so that the black drainage pipe pictured within could remove water from inside the tunnel. It seems the drainage element was added in sometime after the tunnel was originally abandoned, as to keep it from filling with water.